ENVIRONMENTAL IMPACT ASSESSMENT REPORT

TABLE OF CONTENTS

Chapter

Title

 

 

1.

INTRODUCTION

2.

Land contamination issues

3.

AIR QUALITY ASSESSMENT

4.

WATER QUALITY ASSESSMENT

5.

WASTE IMPACT ASSESSMENT

6.

NOISE

7.

VISUAL ILLUSTRATION

8.

IMPLEMENTATION OF MITIGATION MEASURES AND EM&A REQUIREMENTS

9

CONCLUSION:SUMMARY OF ENVIRONMENTAL OUTCOMES

 

Annex A

LAND CONTAMINATION: CONTAMINATION ASSESSMENT PLAN

Annex B

LAND CONTAMINATION: REMEDIATION ACTION PLAN INCLUDING CONTAMINATION ASSESSMENT REPORT

Annex C

SUMMARY OF WORST-CASE CUMULATIVE SO2 AND NO2 CONCENTRATION AT ASRS

 

LIST OF FIGURES

 

 

MainText

Figure 1.1 Location of Proposal New Facilities for L4 &L5 FGD Plant

 

Figure 1.2 General Arrangement of the Additional Equipment for L4 & L5 FGD Plant

 

Figure 1.3 Arrangement of Existing Nos. 4&5 Light Oil Tanks (250m3) to be demoished

 

Figure 1.4 Schematic Diagram of Proposal FGD Plant

 

Figure 3.1 Wind Tunnel Measurement Location

 

Figure 4.1 Location of the Southern Water Control Zone and the Project

 

Figure 4.2 Location of Water Quality Senstive Receivers

 

Figure 4.3 Simplified Schematic Diagram of FGD Wastewater Treatment Plant

 

Figure 4.4 Wastewater Discharge Points from FGD Process

 

Figure 6.1 Location of Noise Senstive Receivers (NSRs)